Bloque: priceitemsCódigo UNSPSC | Descripción | Cantidad | Unidad | Precio unitario estimado | Precio unitario |
---|
72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 176,0000 | M3 | 32.783,0000 | | 72121400 | DEMOLICIÓN DE ESTRUCTURAS | 28,0000 | M3 | 143.763,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 168,0000 | M3 | 109.087,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 31,2000 | M3 | 937.013,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 3,2000 | M3 | 538.191,0000 | | 72121400 | ACERO DE REFUERZO Fy 420 Mpa | 2.315,6000 | KG | 7.531,0000 | | 72121400 | TUBERÍA DE CONCRETO REFORZADO CLASE D (900 mm) DE DIÁMETRO INTERIOR | 20,0000 | M | 821.612,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 27,2200 | M3 | 32.783,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 3,8100 | M3 | 109.087,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 8,6800 | M3 | 937.013,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 2,2100 | M3 | 538.191,0000 | | 72121400 | ACERO DE REFUERZO Fy 420 Mpa | 611,6500 | KG | 7.531,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 240,0000 | M3 | 32.783,0000 | | 72121400 | GAVIONES DE MALLA DE ALAMBRE DE ACERO ENTRELAZADO CLASE 1, RECUBRIMIENTO DE ZINC GALVANIZADO | 208,0000 | M3 | 362.201,4000 | | 72121400 | GEOTEXTIL NO TEJIDO CON RESISTENCIA A LA TENSIÓN GRAB DE 700 N APROXIMADAMENTE | 181,0000 | M2 | 10.009,7100 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 30,0000 | M3 | 109.087,0000 | | 72121400 | REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE LOS ESTUDIOS Y DISEÑOS Y/O ELABORACIÓN DEL CÁLCULO DE LA ESTRUCTURA DEL PAVIMENTO Y/O CÁLCULOS ESTRUCTURALES Y/O DE OBRAS REQUERIDAS PARA GARANTIZAR LA ESTABILIDAD DE LA INFRAESTRUCTURA VIAL | 1,0000 | VG | 6.500.000,0000 | | 72121400 | IVA - REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE LOS ESTUDIOS Y DISEÑOS Y/O ELABORACIÓN DEL CÁLCULO DE LA ESTRUCTURA DEL PAVIMENTO Y/O CÁLCULOS ESTRUCTURALES Y/O DE OBRAS REQUERIDAS PARA GARANTIZAR LA ESTABILIDAD DE LA INFRAESTRUCTURA VIAL | 1,0000 | VG | 1.235.000,0000 | | 72121400 | GESTIÓN SOCIAL Y AMBIENTAL (INCLUYE PAGA E IVA 19%) | 1,0000 | VG | 1.840.903,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 88,0000 | M3 | 32.783,0000 | | 72121400 | DEMOLICIÓN DE ESTRUCTURAS | 14,0000 | M3 | 143.763,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 84,0000 | M3 | 98.272,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 15,6000 | M3 | 926.610,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 1,6000 | M3 | 526.980,0000 | | 72121400 | ACERO DE REFUERZO Fy 420 Mpa | 1.157,8000 | KG | 7.523,0000 | | 72121400 | TUBERÍA DE CONCRETO REFORZADO CLASE D (900 mm) DE DIÁMETRO INTERIOR | 11,0000 | M | 806.112,0000 | | 72121400 | CONFORMACIÓN DE CALZADA EXISTENTE CON ADICIÓN DE MATERIALES | 6,3000 | KM | 11.048.534,3900 | | 72121400 | GESTIÓN SOCIAL Y AMBIENTAL (INCLUYE PAGA E IVA 19%) | 1,0000 | VG | 1.233.032,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 172,0000 | M3 | 32.783,0000 | | 72121400 | DEMOLICIÓN DE ESTRUCTURAS | 14,0000 | M3 | 143.763,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 138,0000 | M3 | 117.920,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 49,0400 | M3 | 936.824,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 3,1400 | M3 | 537.987,0000 | | 72121400 | ACERO DE REFUERZO Fy 420 Mpa | 6.777,2600 | KG | 7.529,0000 | | 72121400 | TUBERÍA DE CONCRETO REFORZADO CLASE D (900 mm) DE DIÁMETRO INTERIOR | 12,0000 | M | 817.543,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 19,4400 | M3 | 32.783,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 2,7200 | M3 | 117.920,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 6,2000 | M3 | 936.824,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 1,5800 | M3 | 537.987,0000 | | 72121400 | ACERO DE REFUERZO Fy 420 Mpa | 436,9000 | KG | 7.529,0000 | | 72121400 | REMOCIÓN DE DERRUMBES | 1.060,5300 | M3 | 15.505,0000 | | 72121400 | CONFORMACIÓN DE CALZADA EXISTENTE CON ADICIÓN DE MATERIALES | 5,2000 | KM | 11.048.534,3900 | | 72121400 | REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE LOS ESTUDIOS Y DISEÑOS Y/O ELABORACIÓN DEL CÁLCULO DE LA ESTRUCTURA DEL PAVIMENTO Y/O CÁLCULOS ESTRUCTURALES Y/O DE OBRAS REQUERIDAS PARA GARANTIZAR LA ESTABILIDAD DE LA INFRAESTRUCTURA VIAL | 1,0000 | VG | 9.036.350,0000 | | 72121400 | IVA - REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE LOS ESTUDIOS Y DISEÑOS Y/O ELABORACIÓN DEL CÁLCULO DE LA ESTRUCTURA DEL PAVIMENTO Y/O CÁLCULOS ESTRUCTURALES Y/O DE OBRAS REQUERIDAS PARA GARANTIZAR LA ESTABILIDAD DE LA INFRAESTRUCTURA VIAL | 1,0000 | VG | 1.716.907,0000 | | 72121400 | GESTIÓN SOCIAL Y AMBIENTAL (INCLUYE PAGA E IVA 19%) | 1,0000 | VG | 2.118.605,0000 | | 72121400 | EXCAVACIONES VARIAS SIN CLASIFICAR | 132,0000 | M3 | 32.783,0000 | | 72121400 | DEMOLICIÓN DE ESTRUCTURAS | 21,0000 | M3 | 143.763,0000 | | 72121400 | RELLENO PARA ESTRUCTURAS CON RECEBO | 126,0000 | M3 | 119.002,0000 | | 72121400 | CONCRETO DE RESISTENCIA 21 Mpa (D) INSITU | 23,4000 | M3 | 890.675,0000 | | 72121400 | CONCRETO RESISTENCIA 14Mpa (F) | 2,4000 | M3 | 488.252,0000 | |
|
|