Bloque: priceitemsCódigo UNSPSC | Descripción | Cantidad | Unidad | Precio unitario estimado | Precio unitario |
---|
11111600 | ARENA DE TRITURACIÓN DE RIO (INCLUYE SUMINISTRO Y TRANSPORTE) | 39,547.00 | M3 | 121,711.00 | | 11111600 | ARENA DE TRITURACIÓN DE CANTERA (INCLUYE SUMINISTRO YTRANSPORTE) | 12,004.00 | M3 | 75,564.00 | | 11111600 | GRAVA TRITURADA DE 1/2" (INCLUYE SUMINISTRO Y TRANSPORTE) | 34,349.00 | M3 | 93,205.00 | | 11111600 | GRAVA TRITURADA DE 3/4" (INCLUYE SUMINISTRO Y TRANSPORTE) | 11,371.00 | M3 | 80,306.00 | | 11111600 | GRAVA TRITURADA DE 1" (INCLUYE SUMINISTRO Y TRANSPORTE) | 50.00 | M3 | 84,957.00 | | 11111600 | ARENA NATURAL DE RIO (INCLUYE SUMINISTRO Y TRANSPORTE) | 3,327.00 | M3 | 117,925.00 | | 11111600 | GRAVA TRITURADA DE 3/4" DE RIO (INCLUYE SUMINISTRO Y TRANSPORTE) | 50.00 | M3 | 120,395.00 | | 11111600 | GRAVA TRITURADA DE 1" DE RIO (INCLUYE SUMINISTRO Y TRANSPORTE) | 4,677.00 | M3 | 119,770.00 | | 11111600 | ARENA DE PEÑA (INCLUYE SUMINISTRO Y TRANSPORTE) | 100.00 | M3 | 64,308.00 | | 11111600 | PIEDRA RAJON TAMAÑO MAXIMO 30 cm (INCLUYE SUMINISTRO Y TRANSPORTE) | 1,785.00 | M3 | 55,042.00 | | 11111600 | MATERIAL FILTRANTE DE 1"(INCLUYE SUMINISTRO Y TRANSPORTE) | 100.00 | M3 | 82,818.00 | | 11111600 | MATERIAL FILTRANTE DE 3" (INCLUYE SUMINISTRO Y TRANSPORTE) | 100.00 | M3 | 83,133.00 | | 11111600 | RELLENO PARA CONFORMACIÓN DE LA SUBRASANTE (RECEBO COMÚN) (INCLUYE SUMINISTRO Y TRANSPORTE) | 100.00 | M3 | 34,324.00 | | 11111600 | SUBBASE GRANULAR CLASE A (SBG-A) (INCLUYE SUMINISTRO Y TRANSPORTE) | 2,257.00 | M3 | 95,158.00 | | 11111600 | SUBBASE GRANULAR CLASE B (SBG_B) (INCLUYE SUMINISTRO Y TRANSPORTE) | 113.00 | M3 | 86,621.00 | | 11111600 | SUBBASE GRANULAR CLASE C (SBG_C) (INCLUYE TRANSPORTE) | 179.00 | M3 | 80,075.00 | | 11111600 | BASE GRANULAR CLASE A (BG_A) (INCLUYE SUMINISTRO Y TRANSPORTE) | 1,492.00 | M3 | 104,551.00 | | 11111600 | BASE GRANULAR CLASE B (BG_B) (INCLUYE SUMINISTRO Y TRANSPORTE) | 149.00 | M3 | 92,280.00 | | 11111600 | BASE GRANULAR CLASE C (BG_C) (INCLUYE SUMINISTRO Y TRANSPORTE) | 765.00 | M3 | 87,417.00 | |
|
|